API Projects
Expected
Delivery
Status System
Size
(kWp)
System
Output
(Annual)
Panels Tennis
Courts
Area
Kettles
Boiled
(Annual)
Households
Powered
(Annual)
Electric
Cars
Charged
(Annual)
Street
Lights
Powered
(Annual)
Tonnes
of CO
Emissions
Reduced
(Annual)
Trees
Planted
(Annual)
Interlink Park, Bardon
2023 Q1 1. On Site
60 51,000 150 1.5 463,636 14 23 355 12 561
Unit1-4 Opus 9, Warrington
2023 Q1 1. On Site
232 185,600 580 5.7 1,687,273 49 82 1,293 43 2,043
Mount Farm, Milton Keynes
2023 Q1 1. On Site
258 193,500 645 6.3 1,759,091 51 85 1,348 45 2,130
Explorer 1&2, Crawley
2023 Q2 2. Committed
75 71,000 188 1.8 645,455 19 31 495 16 781
Wincanton, Bristol
2023 Q2 3. Pipeline
150 136,000 375 3.7 1,236,364 36 60 948 31 1,497
Swift House, Rugby
2023 Q2 2. Committed
240 205,000 600 5.9 1,863,636 55 91 1,429 47 2,256
Alston Road, Washington
2023 Q2 2. Committed
707 600,950 1,768 17.4 5,463,182 160 265 4,188 139 6,614
Drilco, Aberdeen
2023 Q3 3. Pipeline
365 276,000 913 9.0 2,509,091 73 122 1,923 64 3,038
Atos Data Centre, Birmingham
2023 Q3 3. Pipeline
100 75,000 250 2.5 681,818 20 33 523 17 825
CEVA Logistics, Corby
2023 Q3 3. Pipeline
499 442,613 1,248 12.3 4,023,755 118 196 3,084 102 4,871
Rainhill Road, Washington
2023 Q3 1. On Site
1,244 1,057,400 3,110 30.6 9,612,727 281 467 7,369 244 11,637
Timbmet, Shellingford
2023 Q3 3. Pipeline
1,500 1,125,000 3,750 36.8 10,227,273 299 497 7,840 260 12,381
Tetron 93, Swadlincote
2023 Q3 3. Pipeline
390 322,936 975 9.6 2,935,782 86 143 2,250 75 3,554
The Point Retail Park,
Rochdale
2023 Q4 3. Pipeline
102 76,500 255 2.5 695,455 20 34 533 18 842
One Station Square, Bracknell
2023 Q4 3. Pipeline
163 150,000 408 4.0 1,363,636 40 66 1,045 35 1,651
Yarm Road, Stockton-on-Tees
2023 Q4 3. Pipeline
168 142,800 420 4.1 1,298,182 38 63 995 33 1,572
Cullen Square, Livingston
2023 Q4 3. Pipeline
815 643,850 2,038 20.0 5,853,182 171 284 4,487 149 7,086
Symphony, Rotherham
2023 Q4 3. Pipeline
1,761 1,496,850 4,403 43.3 13,607,727 398 661 10,431 346 16,474
Bastion Point, Dover
2024 Q1 3. Pipeline
260 221,000 650 6.4 2,009,091 59 98 1,540 51 2,432
Speedy, Glasgow
2024 Q1 3. Pipeline
364 271,000 910 8.9 2,463,636 72 120 1,889 63 2,983
Ocean Trade Centre,
Aberdeen
2024 Q1 3. Pipeline
964 718,180 2,410 23.7 6,528,909 191 317 5,005 166 7,904
Tetron 141, Swadlincote
2024 Q2 3. Pipeline
995 814,880 2,488 24.4 7,408,000 217 360 5,679 188 8,968
Alston Road Solar Extension,
Washington
2024 Q2 3. Pipeline
861 799,008 2,153 21.1 7,263,709 213 353 5,568 185 8,794
Flamingo Flowers, Sandy
(System Extension)
2024 Q2 3. Pipeline
3,715 3,157,750 9,288 91.3 28,706,818 840 1,395 22,005 730 34,753
Total 15,988 13,233,817 39,970 392.7 120,307,427 3,520 5,845 92,222 3,059 145,648
API Existing PV Portfolio
System
Size
(kWp)
System
Output
Panels Number
of
Tennis
Courts
Kettles
Boiled
Households
Powered
Electric
Cars
Charged
Street Lights
Powered
CO
Emissions
Reduced
Trees
Planted
Flamingo Flowers, Sandy (22/06/2020) 918 1,952,299 2,295 19 17,748,173 519 862 13,605 451 21,486
Unit 4, Easter Park, Bolton
(System 1: 18/05/2012) & (System 2: 01/2023)
310 239,788 775 7 2,179,891 64 106 1,671 55 2,639
160 Causewayside, Edinburgh (27/11/2020) 90 108,874 225 2 989,764 29 48 759 25 1,198
Unit 14, Interlink Park, Bardon (29/03/2019) 50 181,518 125 1 1,650,164 48 80 1,265 42 1,998
Tetron 141, Swadlincote (11/12/2018) 50 182,020 125 1 1,654,727 48 80 1,268 42 2,003
Unit 2, Fareham (20/03/2019) 50 146,674 125 1 1,333,400 39 65 1,022 34 1,614
The Pinnacle, Reading (27/03/2017) 42 150,938 105 1 1,372,164 40 67 1,052 35 1,661
Total 1,510 2,962,111 3,775 32 26,928,282 788 1,308 20,642 685 32,600